Nefyn Beach House, asbestos removal and demolition complete

25 June 2024

The demolition works and asbestos removal are complete at our beach house project in Nefyn, North Wales. The next phase comprises works to the sea wall, external steps, retaining walls and soil stabilisation. The soil stabilisation work will involve inserting circa 300 nails/rods from 4-12m into the cliff face, with plates, anchors and mesh. This work is to retain the slope in an area prone to land slides. The area covered will be circa 1,500m2. 

Photos show the demolition and the trucks (avoiding the high tides) taking the spoil along Nefyn beach. Thanks to Colin Jones (Rock Engineering) Limited who are carrying out the enabling works and have shared these on site photos.